Although I didn’t have much time to work this weekend, I did make a little progress on the shoe rack. The shelves are coming along; in the following image, the mortises for the small stretchers are all complete, as are half of the tenons. The other half of the tenons are marked out and ready for the saw.

There are 18 of these small stretchers, which means 36 more mortise-and-tenon joints, but they go pretty quickly at this size (about 1/2″ square face size for the tenons).
I also picked up some liquid hide glue and glued up one of the side frames:

The Workmate doesn’t seem too bad for this operation. With some fooling around with the bench’s panels, I was able to clamp it between the jaws. Using the liquid hide glue (Titebond in this case) was about as easy as you’d expect–squeeze it out, spread it on the joint, and clamp. This is good, because without a heat lamp or something, I don’t think I’d be able to use hot hide glue in the shop because it’s just too cool down there to have any sort of reasonable open time for glue-up operations that involve more than a handful of joints.
There isn’t much left to do on this project. I need to cut the rest of those small joints (24 left), glue everything up, and then apply some sort of finish.